HomeBrowse ProjectsComplete Hvac & Fire Protection unit For office floor
Complete Hvac & Fire Protection unit For office floor
URGENTSeeking: All / OpenHVAC Installation

Complete Hvac & Fire Protection unit For office floor

KarachiPosted Oct 15, 2026Deadline: Oct 27, 20260 / 20 bids · 20 spots left3d left

Project Description

  1. Heating, Ventilation, and Air Conditioning (HVAC) System

The floor features an industrial exposed-ceiling design with a fully functional air distribution network. • Main Distribution Ducts: Large, rectangular galvanized steel ducts run down the center axis of the ceiling. These serve as the primary supply air mains to move high volumes of conditioned air across the floor. • Insulated Branch Runouts: Flexible, silver-insulated round ducts branch out from the rigid central mains. The thermal insulation prevents condensation and maintains temperature control as air travels to localized zones. • Air Diffusers: Circular, multi-cone supply air diffusers are suspended directly over work areas. This pattern provides an even, 360-degree radial air distribution pattern to eliminate drafts and cold spots in the open office. • Structural Support: Galvanized threaded rods and heavy-duty channel hangers securely anchor the entire duct network into the concrete overhead slab.

  1. Fire Protection & Suppression System

The fire safety infrastructure is heavily emphasized and color-coded to meet standard commercial building codes. • Wet Sprinkler Mains: Bold, red-painted steel piping forms a comprehensive grid below the HVAC layout. The red coloring indicates a wet-pipe sprinkler system, meaning the lines are constantly pressurized with water. • Pendant Sprinkler Heads: Quick-response sprinkler heads face downward at regular intervals along the branch lines. These heads feature heat-sensitive glass bulbs designed to shatter and activate localized water suppression if a fire occurs. • System Labeling: Primary lines are clearly stenciled with white markers (e.g., "FIRE SPRINKLER SYSTEM - WET") for immediate identification by facilities management and emergency responders.

  1. Integrated Systems Coordination

The image demonstrates a clean example of MEP (Mechanical, Electrical, and Plumbing) coordination: • Layering: The fire suppression system is systematically installed underneath the bulky HVAC ductwork. This ensures the water spray from the sprinkler heads has a completely unobstructed path to the office floor below. • Acoustic & Lighting Control: Standard drop-ceiling acoustic tiles border the outer edges of the room to house flush linear LED lighting. The exposed center creates a modern architectural contrast while leaving high-maintenance mechanical units easily accessible.

Expected Deliverable Milestones

1

HVAC Infrastructure & Primary Ductwork Installation

2

Fire Suppression Grid & Piping Rough-In

3

Sprinkler Head Placement & System Pressure Test

Required Bid Submission Sections

Your bid must include all of the following sections to be considered.

1

admin

Required
2

experience

Required
3

tech

Required
4

financial

Required
5

timeline

Required
6

review

Required

Bids Received

0 total bids

Bid details are only visible to the project owner.

Tender Status

Open for Bidding

Bidders propose price in bid submission

Oct 31, 2026 – Nov 3, 2026

DeadlineOct 27, 2026(3d left)
Bids received0 / 20

20 spots remaining

LocationKarachi
SeekingAll / Open

Sign in as a Consultant, Contractor, or Service Provider to place a bid

About the Client

L

lowspeedlevel2001testconsultent

Verified client
Project posted on MEPFSuite
Verified company

Before You Bid

  • Ensure PEC registration is current
  • Prepare company profile document
  • Have BOQ template ready
  • List 3+ similar completed projects
  • Obtain bid security if required