HomeBrowse ProjectsKarachi Data Centre — Cooling and BMS Modernization
Seeking: ConsultantHVAC Design & Engineering

Karachi Data Centre — Cooling and BMS Modernization

KarachiPosted Sep 9, 2026Deadline: Sep 25, 20261 / 20 bids · 19 spots left

Project Description

Project Overview

Engineering design and supervision for modernization of mission-critical cooling and building-management systems in an operating data centre.

Consultancy Scope

  • Cooling-load and redundancy assessment
  • Precision cooling and containment strategy
  • BMS points schedule, controls philosophy, and integration design
  • Tender drawings, specifications, BOQ, and bid evaluation
  • Installation supervision, integrated testing, and commissioning

The solution must preserve uptime and follow a documented live-environment change-control plan.

Expected Deliverable Milestones

1

Tender design and integrated commissioning package

Required Bid Submission Sections

Your bid must include all of the following sections to be considered.

1

admin

Required
2

experience

Required
3

tech

Required
4

financial

Required
5

timeline

Required
6

review

Required

Bids Received

1 total bids

Bid details are only visible to the project owner.

Tender Status

Bidding Closed

Submission deadline has passed

Sep 26, 2026 – Sep 30, 2026

DeadlineSep 25, 2026
Bids received1 / 20

19 spots remaining

LocationKarachi
SeekingConsultant

Bidding Closed

The submission deadline for this tender has passed. No further bids are being accepted.

About the Client

KS

Klyron Studio

Verified client
Karachi, Pakistan
Project posted on MEPFSuite
Verified company

Before You Bid

  • Ensure PEC registration is current
  • Prepare company profile document
  • Have BOQ template ready
  • List 3+ similar completed projects
  • Obtain bid security if required